How many cubic yards are in a dump truck?

By Ali (not a contractor)Updated

A standard tandem dump truck, the 10-wheeler that brings most homeowner orders, has a bed of 10 to 14 cubic yards. It can legally carry about 14 tons, which is about 10 yards of gravel but a full 12 yards of topsoil or mulch. Gravel and sand reach the weight limit before the bed looks full, so the number of yards depends on what goes in the truck.

Dump truck capacity chart: sizes at a glance

A gravel truck is an ordinary dump truck. Dump trucks are named for their rear axles: a single-axle truck has one, a tandem has two, a tri-axle three and a quad four. More axles spread the weight, so the law lets the truck carry more. Bed sizes are in loose cubic yards, usually heaped a little above the sides.

Truck Bed (cu yd) Legal load (tons)
Half-ton pickup 2 to 3 0.7 to 1.2
Single-axle dump 5 to 8 5 to 8
Tandem dump (10-wheeler) 10 to 14 12 to 16
Tri-axle dump 14 to 18 16 to 25
Quad-axle dump 14 to 18 20 to 25
Semi end dump 18 to 26 22 to 25

Trucks in the same class differ by a ton or two because the legal load is the legal gross weight minus that truck’s empty weight. A transfer rig with a second box can reach 26 to 40 yards, but it rarely fits a residential street.

Pickups work the same way. An F-150 bed holds 52.8 to 77.4 cubic feet, which is 2.0 to 2.9 yards (cubic feet divided by 27). On a pickup the payload sets the limit: about 1,400 to 2,400 pounds for a half-ton, 2,000 to 4,200 for a three-quarter ton and 3,500 to 8,000 for a one-ton. Passengers and gear count against it.

Why gravel fills the weight limit first

The calculators on this site use these weights per cubic yard: gravel (#57 stone or pea gravel) 1.4 tons, sand 1.3, topsoil 1.1 and bark mulch 0.3. Cubic yards to tons converts any material.

Take a tandem with a 12-yard bed and a 14-ton legal load.

  • Gravel: a full bed would weigh 12 x 1.4 = 16.8 tons, nearly 3 tons over. The driver stops at 14 / 1.4 = 10 yards, and the bed looks about one-sixth empty.
  • Topsoil: 12 x 1.1 = 13.2 tons, under the limit, so the bed fills first.
  • Mulch: 12 x 0.3 = 3.6 tons, about a quarter of the legal load. The bed is full long before the truck is heavy.

Wet material runs 20 to 30 percent heavier. Rain-soaked gravel at 1.4 x 1.25 = 1.75 tons per yard cuts the same tandem to 14 / 1.75 = 8 yards.

Yards per load, by truck and material

A tandem dump truck carries about 10 yards of gravel, 10.8 of sand and 12 of topsoil or bark mulch. Each figure is the smaller of two numbers: the bed size, or the legal load divided by the weight per yard. Each row uses one typical truck from inside the ranges above, so a real truck can differ by a yard or two.

Truck (bed, legal load) Gravel Sand
Half-ton pickup (2.3 yd, 0.9 t) 0.6 0.7
Single axle (6 yd, 6 t) 4.3 4.6
Tandem (12 yd, 14 t) 10 10.8
Tri-axle (16 yd, 20 t) 14.3 15.4
Quad axle (18 yd, 24 t) 17.1 18 (bed full)
Semi end dump (20 yd, 24 t) 17.1 18.5
Truck Topsoil Bark mulch
Half-ton pickup 0.8 2.3 (bed full)
Single axle 5.5 6 (bed full)
Tandem 12 (bed full) 12 (bed full)
Tri-axle 16 (bed full) 16 (bed full)
Quad axle 18 (bed full) 18 (bed full)
Semi end dump 20 (bed full) 20 (bed full)

A Texas supplier tells customers that a half-ton pickup carries about 1.5 yards of mulch, 1 yard of soil or half a yard of sand or rock, which fits the pickup rows. A 10-yard gravel job in your own half-ton is about 17 trips (10 / 0.6).

What the law allows

On the Interstate system the federal limits are 20,000 pounds on a single axle, 34,000 on a tandem (two axles 40 to 96 inches apart) and 80,000 gross. A short truck with few axles gets a lower gross limit from the Federal Bridge Formula:

W = 500 x (L x N / (N - 1) + 12 x N + 36)

L is the distance in feet between the first and last axle, and N is the number of axles. For a three-axle tandem dump spread over 20 feet: 500 x (20 x 3 / 2 + 12 x 3 + 36) = 51,000 pounds. Take off an empty weight of 26,000 to 32,000 pounds and 19,000 to 25,000 pounds of load is left, about 10 to 12 tons.

Delivery trucks often run on local roads, where state law applies and can allow more. Maine lets a three-axle truck weigh 54,000 pounds, which leaves 22,000 to 28,000 pounds (11 to 14 tons) after the same empty weights. States also set different limits for a tri-axle group: 42,000 pounds in Alabama, 48,000 in Ohio and Maine, and 50,000 in Arkansas. So the same truck is quoted at different tons in different places, and the tons-per-load figure from your own supplier beats any chart. Northern states also post lower limits on many roads during the spring thaw, so a load that works in July can be cut in April.

Delivery fees and minimum loads

Prices checked: Oct 2026.

A truckload has no fixed size: it is whatever the truck sent can legally carry. Sending the truck costs the same with 3 tons or 18, so suppliers set a minimum order and a flat trip fee. Four suppliers post theirs:

Supplier Minimum Delivery fee
Miners Landscape Supply, SC 3 tons $60 flat within 20 miles
Palmetto Sand & Gravel, SC none stated $200 for 1 to 4 tons, $130 for 5 to 14, free at 15 or more
Mulch Mound, NY (topsoil) 3 yards calculated at checkout
Highland Landscape Supply 2 yards $45 to $90 local

Cost guides put a flat fee at $50 to $150 per load within 10 to 20 miles, then $5 to $10 per extra mile, or $10 to $25 per ton. Landscape yards often hold a 1 to 3 ton floor, quarries running their own tandems may want 5 to 10 tons, and many suppliers drop the fee above 10 to 20 tons. A $100 fee adds $33 per ton on a 3-ton order and $5.56 on 18 tons.

A delivered tandem load of gravel (12 to 15 tons) runs about $400 to $900, and a tri-axle load (18 to 22 tons) about $600 to $1,200. As a check, the site’s typical #57 stone price is $40 a ton and typical delivery is $75: 14 x $40 = $560, plus $75 comes to about $635.

How to ask a supplier for a load

  1. Work out your yards, then your tons. A 20 by 30 foot driveway at 4 inches deep is 20 x 30 x (4 / 12) / 27 = 7.4 yards, or 7.4 x 1.4 = 10.4 tons. Add about 10 percent for settling and spillage: 11.4 tons. Order 12 tons.
  2. Use the supplier’s unit. Quarries and aggregate yards usually sell gravel, crusher run and sand by the ton off a scale, so ask for tons. Mulch, topsoil and many landscape yards sell by the yard, so ask for yards. Either way, a partial load still ships as a load, so round up.
  3. Check that the truck can carry it. Multiply yards by tons per yard and compare with the tons per load. An 18-ton gravel order is too much for most tandems, so ask whether they will send a tri-axle or two trucks.
  4. Ask for the tons per load, the fee (flat or per mile), the minimum and the free-delivery threshold. One bigger load usually costs less than two small trips.
  5. Describe the site: where the truck turns around, gate width, overhead wires and soft ground. A tri-axle needs more room than a single-axle truck.

To size the job first, the cubic yard calculator handles any shape, the gravel calculator and topsoil calculator add depth presets and cost, and cubic yards to tons gives the number to read to a supplier who sells by the ton.

Calculators for this job