Units

Paver Calculator

Pavers, paver base, paver sand and edging for a patio, walk or driveway.

4 by 8 in pavers run 4.5 per square foot, so a 10 by 10 ft patio takes 450, or 495 with 10% for cuts.

Shape of the patio

4.5 per sq ft. Thickness does not change the count.

Adds 10% for cuts. Pictures of each pattern are under the calculator.

Dense-graded stone that packs tight. Use what your yard sells as base.

Patio or walkway: 4-8 in after compacting. Clay needs the deeper end.

1 in is standard. Stay within 1-1.5 in.

Pavers · 4 × 8 in

951pavers

4.5 per sq ft · 10% extra

$950

estimate

$4.50 per sq ft

Base · Crusher run · 6 in

3.91cu yd

= 5.87 tons, with 10% extra

Bedding sand · 1 in

0.65cu yd

= 0.88 tons, or 36 bags of 0.5 cu ft

Order 951 pavers, 3.91 cu yd of crusher run and 0.65 cu yd of paver sand.

Pallets: 1.76 at 120 sq ft each for 60 mm pavers, so order 2. Edge restraint: 56 ft around is 7 pieces of 8 ft. Skip sides against a house or wall. Materials, about $1,252: pavers $950, base $158, sand $39, edging $105.

Joint sand for the finished patio is a separate buy: use the sand calculator for polymeric sand.

Prices & extras

Set by the pattern: 10%, 12% or 15%. Small patios need more.

Typical US price. Edit to yours. Concrete $2-8, brick $2-10, travertine $5-15. Blank skips the cost.

Blank = the whole outline. Skip sides against a house or wall, and type it if areas touch.

Paver patterns: pictures and the extra for cuts

Running bond, stack bond and basketweave need about 10% extra for cuts, a 90 degree herringbone about 12% and a 45 degree herringbone or diagonal layout about 15%.

Brick paver patterns from running bond to herringbone pavers: pick one to set the calculator.

Running bondAdd about 10% for cutsStraight cuts at the edgesIn use
Stack bondAdd about 10% for cutsStraight cuts at the edgesIn use
BasketweaveAdd about 10% for cutsStraight cuts at the edgesIn use
Herringbone, 90°Add about 12% for cutsStraight cuts at the edges, more of themRecommended where cars drive (ICPI)In use
Herringbone, 45° or diagonalAdd about 15% for cutsAngled cuts along every edgeRecommended where cars drive (ICPI)In use

Where cars drive, herringbone (45 or 90 degree) holds best: ICPI recommends it for vehicle traffic because the pavers lock together against braking and turning. Running bond can work if its rows run across the drive.

Patterns with 2 or 3 paver sizes (3-piece, random): buy each size from the maker's pattern sheet, not one percentage.

A 16 by 12 ft patio needs about 951 pavers (4 × 8 in, 10% extra for cuts), 3.91 cu yd of crusher run for the base and 0.65 cu yd of paver sand.

How to use the paver calculator

  1. Measure the patio. Pick its shape (rectangle, circle, triangle) or type a square footage you already know. For an L-shaped patio, add another area for each part.
  2. Choose your paver size from the list. The sizes are the nominal ones the makers print, so the joint is already counted. If yours is not listed, pick Custom size and type its length and width; the calculator adds a 1/8 in joint.
  3. Pick the laying pattern; pictures of each are under the calculator. It sets the extra for cuts, and you can change that number under Prices & extras.
  4. Pick patio or driveway. That sets the base depth, which you can overwrite. Use the deeper end on clay.
  5. Choose the base stone and check the sand depth. Open Prices & extras to set your paver price, or to type how much of the edge really needs restraint.
  6. Read the result: pavers, cubic yards and tons of base, cubic yards of sand, pallets for the 4 × 8 brick, edge restraint pieces and a materials estimate.

How the paver calculator works

The patio’s area comes first: length times width for a rectangle, or the matching formula for a circle or triangle, with every extra area added in. Pavers are then counted from the area plus the extra for cuts. The number of pavers per square foot is one square foot divided by the area of one paver (its length times its width, in the same units), and the result is rounded up to a whole paver. Thickness does not change the count. A paver of 2 3/8 in suits patios, walks and residential driveways for cars and pickups, and a paver of 3 1/8 in is the heavy-duty choice.

Cuts are the biggest swing in the count, and small patios waste more, since they have more edge for each square foot.

The base is the area times its compacted depth, turned into cubic yards, plus the extra the site uses for that stone: 10% for crusher run and 15% for #411. Tons come from the stone’s typical weight per cubic yard, so check what your yard’s scale says. The bedding sand works the same way at a depth of 1 in, which is the standard setting bed.

Edge restraint goes along every free edge and is sold in 8 ft pieces. The calculator uses the outline of your shapes. A triangle is treated as a right triangle and a typed area as a square, and both are marked as guesses. Sides against a house or a slab need none, so type the free length if that applies. The cost line adds your paver price to the typical price of the base, the sand and the edging, without delivery.

Joint sand is a separate buy. See the sand calculator for polymeric sand, and the gravel calculator if you want to check the base against other stone.

Pavers per square foot

A 4 × 8 in brick paver takes 4.5 per square foot, a 6 × 6 takes 4 and a 12 × 12 takes 1; these are the nominal sizes makers print, with the joint already included.

Size Pieces per sq ft
4 × 8 in brick 4.5
6 × 6 in 4
6 × 9 in 2.67
8 × 8 in 2.25
12 × 12 in 1
16 × 16 in 0.56
18 × 18 in 0.44
24 × 24 in 0.25

Paver base depth by project

Project Base depth
Patio or walkway 4 to 8 in, 6 in is the safe pick
Driveway 6 to 12 in, 8 in to start

Sand and paver thickness

Layer Standard
Bedding sand 1 in of concrete sand
Paver for patios, walks and cars 2 3/8 in
Paver for heavier loads 3 1/8 in

Worked example

  1. Area: 16 ft × 12 ft = 192 sq ft
  2. Extra for cuts: 192 sq ft × 1.10 = 211.2 sq ft
  3. Pavers: 211.2 sq ft × 4.5 per sq ft = 950.4, round up to 951 pavers
  4. Pallets: 211.2 ÷ 120 sq ft = 1.76, round up to 2 pallets
  5. Base: 192 sq ft × 6 in ÷ 12 = 96 cu ft = 3.56 cu yd; plus 10% = 3.91 cu yd; × 1.5 tons per cu yd = 5.87 tons of crusher run
  6. Sand: 192 sq ft × 1 in ÷ 12 = 16 cu ft = 0.59 cu yd; plus 10% = 0.65 cu yd; × 1.35 tons per cu yd = 0.88 tons, or 36 bags of 0.5 cu ft
  7. Edge restraint: 2 × (16 ft + 12 ft) = 56 ft ÷ 8 ft = 7 pieces
  8. Cost: pavers 211.2 sq ft × $4.50 = $950; base 5.87 tons × $27.00 = $158; sand 0.65 cu yd × $60.00 = $39; edging 7 × $15.00 = $105; total $1,252

Questions people ask

How many pavers do I need per square foot?

A 4 × 8 in brick paver takes 4.5 per square foot, a 6 × 6 takes 4, a 6 × 9 takes 2.67, an 8 × 8 takes 2.25 and a 12 × 12 takes 1. Add about 10% for cuts on a straight pattern, 12% for a 90 degree herringbone and 15% for a 45 degree herringbone or a diagonal layout. The 192 sq ft example patio in 4 × 8 pavers is 951 pavers with 10% extra, about 2 pallets of 120 sq ft.

How much base gravel do I need for a paver patio?

Multiply the area by the compacted base depth in feet. The 192 sq ft example at 6 in is 96 cu ft, or 3.56 cu yd, and with 10% extra it is 3.91 cu yd, about 5.87 tons of crusher run at 1.5 tons per cubic yard. Stone packs down when it is compacted, so order more than the flat volume. At 4 in the same patio needs two thirds as much.

How deep should the base be under pavers?

ICPI asks for at least 4 in of compacted base for patios and walks on well-drained soil, and at least 6 in for residential driveways. Nicolock and Techo-Bloc suggest 4 to 6 in for a patio, 6 to 8 in on clay, and 8 to 12 in for a driveway. The calculator starts a patio at 6 in and a driveway at 8 in. To find how deep to dig, add the base, 1 in of sand and the paver thickness: about 7 to 9 in for a patio.

How much sand goes under pavers?

One inch of concrete sand, never stone dust or mason sand. The 192 sq ft example needs 16 cu ft, or 0.59 cu yd, and 0.65 cu yd with 10% extra for screeding, about 36 bags of 0.5 cu ft. Past a cubic yard, buy it by the yard or the ton instead of in bags.

How much does a paver patio cost?

Concrete pavers run $2 to $8 per square foot, about $4.50 typical. Brick runs $2 to $10 and travertine $5 to $15. Doing it yourself costs about $5 to $10 per square foot for all the materials, and a pallet of pavers is $300 to $800, about $540 for 4 × 8 pavers. Installed patios usually cost $8 to $25 per square foot, with $15 in the middle, and labor alone is $5 to $11.

Which paver pattern is best for a driveway?

45 or 90 degree herringbone: ICPI recommends herringbone where cars drive, since the pavers lock together against braking and turning. Running bond can work with its rows across the drive.

Related calculators