An 80 lb bag of concrete mix makes 0.6 cu ft, so 1 cubic yard takes 45 bags, or 60 bags of 60 lb.

Shape of the area

Patio: 4-6 in deep

BETTER BUY

Bulk · by the yard

1.36cu yd

= 2.6 tons

Range 2.5–2.8 tons

$270

estimate, with delivery

$7.37 per cu ft

Bags · 80 lb

62bags

4,960 lb to carry

$402

estimate

$10.82 per cu ft

Order 1.5 cubic yards of concrete. Covers 100 sq ft at 4 in.

1 cubic yard covers about 81 sq ft at 4 in.

Bags or ready-mix?

Bags or truck: From 1 to 2 cubic yards, get a ready-mix quote too: a truck often costs less than 62 bags of 80 lb, and saves mixing them.

Short-load fee: Plants add a short-load fee below their minimum load, often 3 to 10 cu yd: about $50 to $110 flat, or a charge per missing yard. The ready-mix estimate above includes $80.

Weight: About 5,300 lb (2.6 tons) once poured. 62 bags of 80 lb weigh 4,960 lb to haul.

Bag sizes: For 36.67 cu ft: 62 bags of 80 lb, 82 of 60 lb, 98 of 50 lb or 123 of 40 lb.

Prices & extras

For settling and waste. 0-15%.

Blank = typical 1.95 t/yd³

Typical US price. Edit to yours.

Added to bulk only.

Per 80 lb bag

Footings and post holes

About 3 × the post's width

6 ft fence: 30‑42 in, gravel included

4‑6 in, for drainage

1 hole: 1.54 cu ft of concrete with 10% extra (0.06 cu yd).

Bags: 3 of 80 lb mix, or 5 of 50 lb fast-setting mix.

Set the post on the gravel, then fill around it. Deck posts go 6 in below the frost line.

A 10 by 10 ft patio poured 4 in thick takes about 1.36 cubic yards of concrete with extra for spillage: 62 bags of 80 lb mix, or a ready-mix order of 1.5 cubic yards.

How to use the concrete calculator

  1. Measure the slab as a rectangle, circle or triangle, or type the square feet if you already know them. Add another area for each separate pad or walk.
  2. Pick the project. It fills in a typical thickness: 4 in for sidewalks, patios, shed bases, hot tub pads, garage floors and a driveway used by cars. Type your own if your plans call for more.
  3. Read the result: cubic yards of ready-mix, bags of premix, a price for each and the order line. The box under it says whether bags or a truck make more sense and what the concrete weighs.
  4. Under Prices & extras, change the extra percentage, the bag size or the prices to match your supplier.
  5. For fence posts, deck footings or a wall footing, use the footings and post holes box. It has its own sizes and a quantity.

How the concrete calculator works

The calculator multiplies the area by the thickness, after turning inches into feet by dividing by 12, and divides the cubic feet by 27 to get cubic yards. It then adds 10 percent for spillage, forms that bow out and a base that isn’t perfectly flat, as cost guides and bag makers suggest.

Bags count by yield, not by weight. Quikrete and Sakrete rate an 80 lb bag at 0.6 cubic feet of finished concrete, a 60 lb bag at 0.45, a 50 lb bag at 0.375 and a 40 lb bag at 0.3, so a cubic yard takes 45, 60, 72 or 90 bags. The count always rounds up to a whole bag.

Weight uses 1.95 tons per cubic yard for poured concrete, water included, with 1.85 to 2.05 as the range.

Ready-mix starts at $140 per cubic yard, inside a $110 to $195 range, plus an $80 short-load fee; an 80 lb bag starts at $6.49. Prices differ by region, so type your own quote.

Bags or ready-mix?

Cost guides agree on a rough rule. Under 1 cubic yard, mix bags yourself. From 1 to 2 cubic yards, get a ready-mix quote too, and from 2 up order a truck: 2 yards is 90 bags of 80 lb to mix before the first ones set. On price alone a truck wins sooner.

Wet concrete burns skin and eyes. Wear waterproof gloves and eye protection, and rinse any splash off with plenty of water, as the makers’ data sheets say.

The catch is the short-load fee. Plants have a minimum load, often somewhere from 3 to 10 cubic yards, and charge a flat $50 to $110 below it, or a charge for each missing yard. Some won’t deliver under 1 yard at all.

Footings, post holes and Sonotube piers

Call 811 before you dig a footing or post hole: the call is free and gets buried lines marked. A post hole is figured as the hole minus the post. Dig it 3 times as wide as the post, so 12 in for a 4×4 and 18 in for a 6×6, and deep enough to bury 1/3 to 1/2 of the post’s height above ground. Put 4 to 6 in of gravel in the bottom for drainage; it holds no concrete, so the box leaves it out. A 4×4 post on a 6 ft fence takes 1.4 to 2.1 cubic feet of concrete per hole, and a 6×6 gate post standing 8 ft tall takes 4.15 to 6.23, before extra.

Fast-setting mix is made for posts: pour it dry and soak it.

Deck footings and piers are round, and a cardboard form tube such as a Sonotube sets their diameter: pick the round option in the footings box and type the tube size. The AWC deck guide lists 18 to 42 in across and 7 to 19 in thick, depending on the deck’s spans and the soil. Wall footings under a house are continuous strips; the code minimum for one story is 12 in wide and 6 in thick, and 16 by 8 in is common. Every footing sits on undisturbed soil at least 12 in down and below the frost line, and deck posts go 6 in past it. Your building department knows your frost depth.

Slab thickness guide

The project presets use these thicknesses. The last column counts 80 lb bags for every 100 sq ft, with 10 percent extra, rounded up as the calculator does. One cubic yard covers 81 sq ft at 4 in, 64.8 at 5 in and 54 at 6 in.

Job Thickness 80 lb bags
Sidewalk or walkway 4 in 62
Patio 4 in 62
Shed or small base 4 in (up to 6 in) 62 (92 at 6 in)
Hot tub pad, reinforced 4 in 62
Garage floor 4 in (code: 3.5) 62
Driveway, cars 4 in 62
Driveway, trucks or RVs 5-6 in 77-92

Rebar and mesh are bought separately. For walls, use the concrete block calculator or the retaining wall calculator.

Worked example

  1. Area: 10 ft × 10 ft = 100 sq ft
  2. Depth: 4 in ÷ 12 = 0.333 ft
  3. Volume: 100 sq ft × 0.333 ft = 33.33 cu ft
  4. Extra for settling: 33.33 cu ft × 1.10 = 36.67 cu ft
  5. Cubic yards: 36.67 ÷ 27 = 1.36 cu yd (1.04 m³)
  6. Weight: 1.36 cu yd × 1.95 tons per cu yd = 2.6 tons (2.4 tonnes)
  7. Order: round up to 1.5 cubic yards, or 62 bags of 80 lb

Questions people ask

How many bags of concrete are in a yard?

A cubic yard is 27 cubic feet. It takes 45 bags of 80 lb mix at 0.6 cubic feet each, 60 bags of 60 lb, 72 bags of 50 lb or 90 bags of 40 lb.

How many bags of concrete do I need for a 10x10 slab?

At 4 inches thick a 10 by 10 ft slab holds 33.33 cubic feet. With 10 percent extra for spillage and an uneven base that is 36.67 cubic feet, or 1.36 cubic yards: 62 bags of 80 lb mix.

How thick should a concrete slab be?

4 inches for sidewalks, patios, shed bases and hot tub pads, which should also be reinforced. Driveways are 4 inches for cars and 5 to 6 inches for trucks or RVs. Garage floors are 4 inches in practice; the code minimum is 3.5. One cubic yard covers 81 square feet at 4 inches and 54 at 6.

How much does a yard of concrete cost?

Delivered ready-mix runs about $110 to $195 per cubic yard, and the calculator starts at $140. Orders under the plant's minimum load, often 3 to 10 cubic yards, add a short-load fee, commonly a flat $50 to $110. A contractor-poured plain slab costs about $4.30 to $10.50 per square foot, materials and labor together.

Is it cheaper to buy bags or order a truck?

Once you need about 1 cubic yard, the truck is usually cheaper. 45 bags of 80 lb mix at $6.49 to $7.35 make one cubic yard for about $292 to $331, while ready-mix costs $110 to $195 plus a short-load fee. Bags make sense under 1 cubic yard, where some plants won't deliver.

How many bags of concrete does a fence post need?

For a 4x4 post on a 6 ft fence, in a 12 inch hole with 24 to 36 inches of the post in the ground on 6 inches of gravel, figure 1.4 to 2.1 cubic feet of concrete per hole. That is about 3 to 4 bags of 80 lb mix or 4 to 6 bags of 50 lb fast-setting mix, plus extra for spillage.